TASKS

TASK:ASSIGNED TO:NEEDED BY:COMPLETED ON:
E10 AIR FILTERWYATTSOONDONE
SAW PACK
ATV
RANGER

REDLANDS ?
STEVE W

SOON
SOON
E10 FOAM SYSTEM DRAINED, FLUSHED, FILLED WITH HIGH XREDLANDSMONDAY NIGHT AFTER MEETINGDONE
TRASH TAKE OUT AT HOTCHKISS STATION?MONDAY MORNINGSDANIEL MCC
COMMAND POST MECH CHECK OUT, REPORTTRAVISCOMPLETE8/14
800 RADIO INSTALL
E7
DOUG8/21DONE
E3 SECONDARY FOAM SYSTEM REINSTALLED?MONDAY NIGHTDONE
LOW VOLTAGE SWITCH HURST PUMPBOB TSOON
COMMAND POST TRAILER HITCHANDY?
PLANE DOOR INTO AMBULANCE BAYDOUG OR WESTMONDAY
HOSE TOWER FAN SHROUDDOUG, ETC.SEPTEMBER
COMMAND POST WORK
CASCADE SYSTEM
AIR CONDITIONER
DESK
MOVE SEAT
TRAVIS
REMOVE DECK LIGHTS FROM 24V BLOCK ON E7 TO CONTROL SWITCH HEADSTANSEPTEMBER
WELD HITCH JACK ON E6 TRAILERSTEVE ESEPTEMBER
REPLACE RANGER RADIO / SPEAKER
INSERT "UPDUCT" BLOCKS, OTHER WEATHERIZATION BOTH STATIONSLATE SEPTEMBER